
Nails Creek
Henry County, Georgia
AEC was tasked with recreating wetland conditions in the Nails Creek basin. The analysis of flows included low flow and higher storm events. Weir designs and details were developed as part of the construction documents.
Scope of Work – Environmental Engineering, Civil Engineering, Hydrologic Analysis, and Hydraulic Analysis
|
|