City of Roswell, Waterline Improvements on Norcross
Street (CDBG).
Scope of Work – This project was funded by a
Community Development Block Grant (CDBG and included
the design of approximately 4,840. linear feet of 12
inch waterline on Norcross Street and 2,370 linear
feet of 8 inch waterline on Crestview Circle and Delmont
Terrace in the City of Roswell. This was a two phase
project which was constructed in 2002 and 2003. The
construction methods used in this project included
typical trench construction, directional drilling,
and aerial crossings. AEC services included surveying,
design, construction administration, construction observation,
and as-built drawings. |
|